BMC Demolition was engaged to fully demolish an old kindergarten facility in Wyndham to make way for new construction. The project included the complete teardown of the existing structure, removal of all debris, and site preparation for future development. Our team managed the safe and efficient dismantling of the facility, ensuring adherence to environmental and safety regulations.
Project Scope:
- Client: Private Owner
- Location: Wyndham
- Building Type: Kindergarten School
- Duration: 3 Days
- Completion Date: 5th September
Challenges:
- The demolition of a community facility in a residential area required careful coordination to minimize disruption to the surrounding neighbourhood.
- Ensuring the safety of structures and utilities near the kindergarten.
- The presence of hazardous materials, such as asbestos, in the building structure necessitated specialised handling and removal procedures.
Our Approach:
- Coordinated with local authorities and surrounding residents to ensure minimal disruption and timely updates on the progress of the demolition.
- Utilised advanced demolition techniques to carefully dismantle the building without impacting adjacent properties or utilities.
- Implemented strict safety protocols, particularly for the removal and disposal of hazardous materials, following industry best practices to ensure compliance with environmental regulations.
- Conducted thorough site clean-up and waste management, recycling salvageable materials where possible.
Outcome:
The kindergarten was successfully demolished, and the site was cleared and prepared for future construction. The project was completed on time and without incident, thanks to the strategic planning and rigorous safety measures taken throughout the demolition process. Our commitment to sustainability was reflected in the recycling of materials and adherence to environmental guidelines.